Advanced — Shift Planning

Deep-dive into the shift rules engine, bulk grid operations, open shift claiming mechanics, and conflict detection.

The shift rules engine

Shift rules follow a WHEN/THEN structure:

  • WHEN — a trigger based on the person's existing assignments.
  • THEN — a restriction on future assignments.

Hard rules block the assignment entirely. Soft rules show a warning — managers can override them, employees cannot.

Use hard rules for legal or contractual obligations, soft rules for operational guidelines that admit legitimate exceptions.

Note

Scope priority: location-specific rules override global rules for that location. When two rules conflict, the blocking rule always wins.

Bulk operations in the grid

  • Copy day — copy all shifts from one date to another (without assignments).
  • Fill row — fill every cell in the team row for the visible period with the same pattern. Existing shifts are overwritten.
  • Fill column — fill all cells for a date with the same pattern.
  • Fill grid — fill all empty cells in the visible period; existing shifts are skipped.

Open shifts — claiming logic

An open shift only appears in the employee's list if it is both open and published. Once a shift reaches its required headcount, it closes automatically.

Employees can return a shift up to 24 hours before it starts — this window is enforced server-side.

Conflict detection

When the assignment dialog opens, the system checks three things:

  1. Time overlaps — the person's existing assignments that overlap in time.
  2. Shift rules — all active rules in scope are evaluated.
  3. Absences — a full-day approved vacation, statutory service or maternity leave, or an acknowledged 100 % sick leave blocks the assignment. Pending requests, half days, partial incapacity and other absence types show a warning.

Important

Not automatically checked: weekly maximum working hours. Verify them before publishing, or configure an explicit shift rule.