The hourly-rate hierarchy
Three levels decide which rate appears on an invoice line:
- Individual project rate — set for a specific person in the project's “Team” tab. Always wins.
- Project default rate — applies to every team member without an individual rate.
- Employee default rate — the fallback from the person's profile.
If all three are empty, the line is imported at a zero rate. The most common mistake: forgetting to set the default rate for new employees before their first billing cycle.
Important
The rate is resolved when hours are imported onto the invoice, not when they are clocked. If you change a project rate in week 3, the hours from weeks 1–2 also pick up the new rate on the next import.
Using CSV import well
The import is all-or-nothing — one bad row aborts the whole batch. The most common causes:
- Wrong date format — use
YYYY-MM-DD;DD.MM.YYYYfails. - Duration instead of start/end — the template expects a start and end time, not a pre-calculated duration.
- Unknown project name — the import matches on exact name. Export project names straight from the app.
- Duplicates — the preview flags entries with the same person, date, start time and end time.
Tip
Check the preview row by row before every import — it surfaces format errors and duplicates before anything is written.
Payroll locking
As soon as payroll is generated for a period, every processed time entry is locked — read-only, non-deletable, and removed from the “Unbilled hours” tab.
Note
To fix an incorrect locked entry: unlock it, delete it, then re-create it corrected. The new entry shows up as an adjustment in the next payroll run.
How the hour balance is calculated
- Target hours = contractual weekly hours × work percentage, adjusted for cantonal public holidays, approved absences and sick leave.
- Actual hours = the sum of all completed time entries for the week.
Note
Pending absences (status “pending”) do not reduce the target yet — only once approved.